Testimonial

 

TESTIMONIAL

CUSTOMER NAME
SERVICES
START
END
MV. MODERN LINK Dry Docking (Out Fitting Job, Hull Scrapping, Washing & Painting, Engine Room Valve Service, Electro Motor Service and Pipe Renewal) in PT. Drydocks World Pertama (PaxOcean), Tanjung Uncang – Batam   18th January 2018 31st January 2018
MV. TUAH 2 ETA on 23th September 2017 (Arrival from Kukup, Malaysia), ETD on 30th October 2017 (Departure to Kukup, Malaysia). “Dry Docking” at PT. Cahaya Samudra Shipyard, Batam  23rd September 2017  30th October 2017
MV. TUAH 1 ETA on 01st August 2017 (Arrival from Kukup, Malaysia), ETD on 24th August 2017 (Departure to Kukup, Malaysia). “Dry Docking” at PT. Cahaya Samudra Shipyard, Batam  01st August 2017  24th August 2017
AHTS. SANKO ENERGY “Bollard Pull Test 85 T” at PT. Drydocks World Pertama and enchorage at Batu. Ampar, Batam 03rd January 2017 25th April 2017
MV. FORTUNE CLOVER Dry Docking (Hull Blasting & Painting, Propeller & Tail Shaft Work, Sea Valve and Sea Water Pipe) in PT. Drydocks World Pertama (PaxOcean), Tanjung Uncang – Batam 12th August 2016 21st August 2016
Docking Survey, Annual Survey & Propeller Proppeller Shaft Survey (P) in PT. Nanindah Mutiara Shipyard (PaxOcean yard) Tj. Uncang. Batam 06th February 2016 01st March 2016
Bollard Pull Test 128.8T in PT. Drydocks World Pertama (PaxOcean Yard) Tj. Uncang. Batam 05th November 2015 06th November 2015
Docking (Blasting, Painting, Piping and Cleaning) at PT. Drydocks World Pertama Tj. Uncang. Batam 08th March 2015 23th March 2015
On Hire SV. Feg Merlin by MTC Engineering SDN BHD 01st May 2014
Escort DS. Bolette Dolphin, Batam-Banda Aceh-Batam 22nd March 2014 26th March 2014
Anchorage (with Supply Fresh Water, HSD Oil/MGO, Provision and Material Equipments at Batu Ampar. Batam 07th June 2013 05th September 2013
Floating Repair, in Drydocks World Pertama Shipyard, Tj. Uncang. Batam 02nd December 2012 09th December 2012
Dry Docking (with Export & Import, Crew Change) in Drydock World, Nan
Indah, Tj. Uncang. Batam
29th April 2012 02nd December 2012
Anchorage (with supply provision/Fresh water, Crew Changes) in Batu Ampar. Batam 05th December 2011 11st January 2012
Anchorage (with supply provision/Fresh water, Spare Parts, Load Test and Davits)
in Batu Ampar. Batam
01st July 2011 30th September 2011
CIQP / Crew Mobilization / Supply Material and others in Batam 18th November 2009 18th February 2010
CIQP and others in during Anchorage at Batu Ampar Area. Batam 11st November 2009 23rd February 2010
Anchorage and Other Assist in Batu Ampar Area 23rd October 2009 10th December 2009
CIQP and all others arrangement and etc during ship repaired in Surya Prima
Bahtera Shipyard
10th October 2009 18th October 2009
Shipping Agent during Floating and Others in Batam ASL Shipyard. Tj. Uncang.
Batam
21st August 2009 24th November 2009